Replace 701-3H Computer Room Air Conditioner CX(s) Applied: B1.15Date: 02/04/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Categorical Exclusion Determination
Critical Infrastructure Test Range Complex High Frequency Test Bed Expansion CX(s) Applied: B1.15Date: 01/12/2016 Location(s): IdahoOffices(s): Nuclear Energy
Siting, Construction, and Operation of Chemical Consolidation Facility (CCF) CX(s) Applied: B1.15Date: 01/05/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
MSA Annual Categorical Exclusion for Support Buildings CX(s) Applied: B1.15Date: 12/31/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Fresh Fuel Glovebox and Laboratory Hood Installation and Operation CX(s) Applied: B1.15Date: 12/07/2015 Location(s): IdahoOffices(s): Nuclear Energy
Categorical Exclusion Determination
National Environmental Policy Act Determination at Fermi National Accelerator Laboratory CX(s) Applied: B1.15Date: 12/03/2015 Location(s): IllinoisOffices(s): Fermi Site Office
284-H Battery Room Relocation CX(s) Applied: B1.15, B1.23Date: 12/01/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Test Reactor Area (TRA)-1608 Water Fountain Replacement CX(s) Applied: B1.15, B1.24Date: 11/20/2015 Location(s): IdahoOffices(s): Nuclear Energy