Bonneville Power Administration (BPA) proposes to construct the Vancouver Control Center (VCC) project at the J.D. Ross Substation and Regional Ope…
The CUIR is a site-wide utilities and infrastructure improvement project that will provide reliable, efficient, and sustainable utility systems to …
The scope of the Facility Storage Area General Plant Project includes constructing a permanent foundation for a modular steel building approximately 200 square feet in size.
Laydown Area East of Old Powerhouse for Equipment Storage, K-Area…
The proposed project would be to demolish and dispose of three trailers at the Special Technologies Laboratory (STL) in Santa Barbara and replace t…
The KS Building (Bldg.) 28 Motor Drive Replacement (Bldg. 28 MDR) project will replace the existing main propulsion drive located in Bldg. 28 with a new power supply consisting of four new inverters and a new transformer rectifier.
With the developing construction of the Surplus Plutonium Disposition (SPD) Project, two fabric tension structures (Quonset hut), enclosure fencing…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Georgia Institute of Technology (Georgia Te…
Install Pizza Ovens in 766-H.…
Siting, construction, and operation of an administrative support structure within the K-Area restricted area.…