The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Medford, MA, for the installation o…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement. …
The objectives of this project are to develop and demonstrate HTE for efficient hydrogen production from steam using solid-oxide electrolysis cells…
The Classified Islands project will modify existing buildings to create Vault Type Rooms (VTR).
Modifications and renovations to Building 707-C will be made so the structure may be used as the Backup Computer Facility (BCF).…
New temporary K Area parking lot to support SPD Construction.…
The DOE-LM is proposing to install carports and a patented Beam EV ARC solar-powered level 2 dual-port electric vehicle charging station (EVCS) in …
Install a Quonset Building in the K-Area Construction Fabrication Area.…
The goal of this project is to enable decarbonized methanol synthesis by demonstration of a novel, high yield and deactivation resilient catalyst i…
With the evolving construction of the Surplus Plutonium Disposition (SPD) Project an existing Quonset hut (763-111N) will be removed, and a new fab…