Routine Maintenance Along Captain Jack-Olinda (CPJ-ODA) 259, 260, 261, 262, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, and 291CX(s) Applied: B1.3, B1.13Date: 05/20/2010Location(s): CaliforniaOffice(s): Western Area ...
Vegetation Management - Routine Maintenance Along Captain Jack-Olinda Transmission LineCX(s) Applied: B1.13, B1.3Date: 05/20/2010Location(s): CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada Region
Township Pedestrian Link to Public LibraryCX(s) Applied: B1.13, A1, B5.1Date: 05/18/2010Location(s): Manheim, PennsylvaniaOffice(s): Energy Efficiency and Renewable Energy
Rattlesnake-Garrison Number-1 Wood Pole InstallationCX(s) Applied: B1.13, B4.6, B1.3Date: 05/13/2010Location(s): Missoula County, MontanaOffice(s): Bonneville Power Administration
C-Farm Electrical, Lighting, and Walkway UpgradesCX(s) Applied: B1.13, B2.1, B1.3Date: 04/27/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Pajarito Road Right-Of-Way Shift at TA-50 and TA-55CX(s) Applied: B1.13Date: 04/21/2010Location(s): New MexicoOffice(s): Los Alamos Site Office
Weirbox InstallationCX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3Date: 04/02/2010Location(s): Casper, WyomingOffice(s): RMOTC
Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing BridgeCX(s) Applied: B1.13, B1.3Date: 03/31/2010Location(s): Spokane County, WashingtonOffice(s): Bonneville Power Administration
Tehachapi Wind Energy StorageCX(s) Applied: A9, B1.13, B3.6, B4.4, B4.6, B5.1Date: 03/24/2010Location(s): Kern County, CaliforniaOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission LineCX(s) Applied: B1.13Date: 03/12/2010Location(s): Snohomish, WashingtonOffice(s): Bonneville Power Administration