B-40 Daycare Evacuation Sidewalks CX(s) Applied: B1.13, B2.5 Date: 07/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory
792-A Sidewalk Installation CX(s) Applied: B1.13 Date: 07/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office
Garrison Substation Access Roads CX(s) Applied: B1.3, B1.13 Date: 05/28/2013 Location(s): Montana Offices(s): Bonneville Power Administration
Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration
Routine and Non-Routine Activities at the Grand Junction, Colorado, Office Site CX(s) Applied: B1.3, B1.4, B1.7, B1.13, B1.15, B1.16, B1.23, B1.24, B1.28, B2.1, B2.2, B2.4, B2.5, B3.1, B5.16, B6.1 Date: 09/21/2012 Location(s): Grand Junction Offices(s...
2012 Access Road Maintenance Along the Path 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/24/2012 Location(s): California, California Offices(s): Western Area Power Administration
Modeling Carbon Dioxide Sequestration in Saline Aquifer and Depleted Oil Reservoir (Task 17 - Borehole) CX(s) Applied: A9, B1.13, B3.1, B3.7 Date: 06/26/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory
Platform Construction for Power Pole Work CX(s) Applied: B1.13, B2.5, B4.6 Date: 06/18/2012 Location(s): Wyoming Offices(s): RMOTC
Energy Efficiency and Conservation Block Grant Program - Greenville County, South Carolina CX(s) Applied: B1.13 Date: 04/11/2012 Location(s): South Carolina Offices(s): Golden Field Office
Minnesota City-Blaine CX(s) Applied: A1, B1.13, B2.5, B5.1 Date: 03/27/2012 Location(s): Minnesota Offices(s): Energy Efficiency and Renewable Energy