Categorical Exclusion Determinations: B1.13

Rattlesnake-Garrison Number-1 Wood Pole InstallationCX(s) Applied: B1.13, B4.6, B1.3Date: 05/13/2010Location(s): Missoula County, MontanaOffice(s): Bonneville Power Administration
C-Farm Electrical, Lighting, and Walkway UpgradesCX(s) Applied: B1.13, B2.1, B1.3Date: 04/27/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing BridgeCX(s) Applied: B1.13, B1.3Date: 03/31/2010Location(s): Spokane County, WashingtonOffice(s): Bonneville Power Administration
Tehachapi Wind Energy StorageCX(s) Applied: A9, B1.13, B3.6, B4.4, B4.6, B5.1Date: 03/24/2010Location(s): Kern County, CaliforniaOffice(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory
Access Road Improvement Project for Structure 12/1 of the Snoking Tap to Echo Lake-Monroe Number 1 Transmission LineCX(s) Applied: B1.13Date: 03/12/2010Location(s): Snohomish, WashingtonOffice(s): Bonneville Power Administration
City of Martinsville Landfill Gas to Electricity ProjectCX(s) Applied: B1.13, B1.15, B5.1Date: 02/19/2010Location(s): Martinsville, VirginiaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
Improvements to the Road 2 and SC 125 IntersectionCX(s) Applied: B1.13Date: 01/25/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office