There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Place an INL boundary sign every 500 feet along the 33-mile northeast cornerboundary and restore a trespasser-damaged canal.…
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…
Remove one deteriorated protective chain-link fencing system and reinstall a replacement system using all new material and hardware.…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary e…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment,transmission towers, and auxiliary elec…
The scope of the A7 Office Building project includes the design and construction of a multi-storyoffice building located within the parking lot in a …
BPA proposes to fund the Confederated Tribes of the Umatilla Indian Reservation operation and maintenance activities on the Rainwater Wildlife Are…
Demolish and replace the existing fence by Building 25.…
Southwestern Power Administration proposes to construct 8 feet tall, 1,500 linear feet security fence surrounding the Southwestern Power Administra…