Install additional roof security barriers to the Main Tritium Entry Control Facility (Building 701-3H).…
This document details a scope change in section 21 from previously approved ERF ANL-985-1027, due to tree removal.…
This document details a scope change in section 21 from previously approved ERF ANL-985-1027, due to tree removal.…
R and D Plateau Parking Lot Seal Coat and Line Striping, 920 Plateau Sidewalk Lighting and Underground Wiring Replacement, 900/920 Area Replacement…
This revision addresses the proposed installation of a 12 by 40 ft trailer in a 6,000 ft2 area to support construction activities at the Specific M…
There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Place an INL boundary sign every 500 feet along the 33-mile northeast cornerboundary and restore a trespasser-damaged canal.…
To construct a communication tower, foundation for a prefabricated concrete building, parking garage, chain link fence, and perform ditch redevel…
Remove one deteriorated protective chain-link fencing system and reinstall a replacement system using all new material and hardware.…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary e…