Development of Methods to Prohibit and Remediate Loss of Annular Isolation in Shale Gas Wells CX(s) Applied: A9, A11, Specific Category: field observation of drilling operations Date: 11/21/2013 Location(s): Arkansas Offices(s): National Energy Techno...
Advanced Low-Cost Silicon Carbide (SiC) and Gallium Nitride (GaN) Wide Bandgap Inverters for Under-the-Hood Electric Vehicle Traction... CX(s) Applied: B3.6 Date: 09/16/2013 Location(s): Arkansas Offices(s): National Energy Technology Laboratory
Advanced Low-Cost Silicon Carbide (SiC) and Gallium Nitride (GaN) Wide Bandgap Inverters for Under-the-Hood Electric Vehicle Traction... CX(s) Applied: B3.6 Date: 09/16/2013 Location(s): Arkansas Offices(s): National Energy Technology Laboratory
The Arkansas Highway Transportation Dept. (AHTD) proposes to widen Highway 167.…
Southwestern Power Administration proposes to relocate one and add two additional transmission line structures to rectify safety and reliability co…
Arkansas Energy Office State Energy Program 2012 CX(s) Applied: A9, A11 Date: *no date posted* Location(s): Arkansas Offices(s): Golden Field Office
Relay and Switchboard Panel Replacements CX(s) Applied: B4.6 Date: 10/29/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration
Recovery Act: Hydroelectric Facility Improvement Project - Replacement of Current Mechanical Seal System with Rope Packing System CX(s) Applied: B5.1 Date: 07/25/2012 Location(s): Arkansas Offices(s): Golden Field Office
Line 3010 Structure 38-44, 59 and 60 Transmission Structure Movement Project CX(s) Applied: B2.5 Date: 07/02/2012 Location(s): Arkansas Offices(s): Southwestern Power Administration
Interstate Electrification Improvement CX(s) Applied: B5.1, B5.23 Date: 02/22/2012 Location(s): Arkansas Offices(s): National Energy Technology Laboratory