Award Number: DE-EE0009287, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): DE, Office(s): Golden Field Office
Award Number: DE-EE0009043, CX(s) Applied: A9, B2.2, Federal Energy Management Program, Location(s): FL, Office(s): Golden Field Office
Design, build and operate an optimized engineering scale (0.5 MWe) mixed-salt process (MSP) test system at the University of Illinois Abbott Power …
Award Number: DE-EE0009252, CX(s) Applied: A9, Fuel Cell Technologies Office, Location(s): IL, Office(s): Golden Field Office
Develop an economically viable process for production of coal-derived aerogel envelope as thermal-insulated building material with low-cost product…
Award Number: DE-EE0009035, CXs Applied: A9, B1.31, B1.4, B2.4, B5.1, Federal Energy Management Program, Location: NC, Office: Golden Field Office
Award Number: DE-EE0009253, CX(s) Applied: A9, A11, B3.6, Fuel Cell Technologies Office, Location(s): CA, Office(s): Golden Field Office
Determine the technical competitiveness and economic viability of coal-based bricks and blocks using anthracite and plastic waste binder and assess…
Award Number: DE-EE0009236, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0009244, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): MN, Office(s): Golden Field Office