Conceptual energy system design, combustion system rig testing, technoeconomic study, technology gap assessment, and commercialization plan.…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Comprehensive computational modeling of reversible methane electrochemical reactor (Recipient). Develop and test reversible methane electrochemical…
Award Number: DE-EE0009247, CX(s) Applied: A9, B3.6, B3.15, Fuel Cell Technologies Office, Location(s): IN, Office(s): Golden Field Office
Award Number: DE-EE0009250, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): MO, Office(s): Golden Field Office
Award Number: DE-EE0009239, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0009269, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): NJ, Office(s): Golden Field Office
Award Number: DE-EE0009042, CX(s) Applied: A9, A11, B3.1, Federal Energy Management Program, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0009351, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office
Award Number: DE-EE0009331, CX(s) Applied: A9, B3.6, B5.15, Solar Energy Technologies Office, Location(s): WA, Office(s): Golden Field Office