Pilot Test Facility Construction and Field Pilot Scale Test Demonstration, including construction and operation of a CO2 capture test facility at t…
Demonstrate the feasibility of a new class of scalable, low-cost sorbents for H2 storage and integration to fossil fuel power plants.…
Under Phase 2, the recipient will perform modelling efforts to develop the cyber-physical components needed to adapt the NETL HYPER so that NETL ca…
Award Number: DE-EE0009369, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): GA, Office(s): Golden Field Office
Feasibility study that determines the economic and technical feasibility for using IHESS. Computer based modeling, report writing, technology gap a…
Project mgmt, reporting and documentation, conceptual energy system design, system assessment, storage system support, system sizing study, technoe…
The objective is to perform a comprehensive FEED study for the optimized plant configuration at the host site.…
Conceptual energy system design, combustion system rig testing, technoeconomic study, technology gap assessment, and commercialization plan.…
Remodel the B17 Central High Bay area to provide updated offices with new furniture, doors, fire suppression system, new infrastructure, new HVAC, …
Comprehensive computational modeling of reversible methane electrochemical reactor (Recipient). Develop and test reversible methane electrochemical…