BPA proposes to replace static ground wire in the Dworshak-Taft No. 1 between 72 and 78 mile due to at the ground wire being damaged at various loc…
Provide federal funding to the University of Houston to develop novel methods to map and characterize subsurface fractures using 3D seismic data in…
Provide federal funding to the Colorado School of Mines to develop deep learning models for detecting potential geothermal exploration sites from h…
BPA proposes to work in conjunction with Mason County Public Utility District (PUD) 3 and Jefferson County PUD (separately) to upgrade fiber optic …
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
BPA proposes to interconnect Avangrid’s 202-megawatt (MW) solar development project with BPA’s electrical system at Maupin Substation. …
BPA proposes to acquire an existing radio tower located at the Mt. Spokane Radio Microwave Station operated by BPA in Spokane County, Washington. …
Washington State University (WSU) proposes to enhance the safety, performance, and continued operational reliability of the WSU Nuclear Science Center 1 MW TRIGA reactor by 1) restoring the reactor tank concrete, which is in much need of repair due to epoxy failure, and 2) replacing the epoxy concrete tank liner with a modern, robust epoxy liner.
The University of Wisconsin (UW) proposes to enhance the neutron radiography capabilities at the UW Nuclear Reactor (UWNR) and associated Characterization Laboratory for Irradiated Materials (CLIM), by acquiring a high-resolution detector, rotation stage, visualization software and a high-performance computer.
The University of Maryland (UMD) proposes to replace the Radiation Area Monitors (RAMs) for the Maryland University Training Reactor (MUTR).