Re-route 772-1F steam condensate discharge.…
The SRS fire department will replace current firefighting foams that contains PFAS with a more “green” alternative.…
This EEC covers the design for the relocation of part of the 234-H Finishing Line process to 233-H.…
Prep and paint the 614-24G “C” Area WIND tower, 614-23G “F” Area WIND tower, and 614-22G “H” Area WIND tower.…
Repair and/or replace non-asbestos floor coverings in Building 730-4B.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electrical r…
Passive counting of environmental samples using radiation detectors.…
Samples and High Level waste will be characterized and prepped for return to the Generator (SRR Tank Farm).…
The Oxzilla O2 analyzer system is used to measure oxygen in a gas stream with a high degree of precision.…
This EEC will only cover the collection of samples and the analysis of samples that will be analyzed at SRNL as well as the transport of the stored…