BPA proposes to install a new heating, ventilation, and air conditioning (HVAC) system at BPA’s Covington Substation Maintenance Headquarters build…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Remediation (SRR) Faciliti…
Replace light ballasts in room 400 at 704-4N.…
Replace exterior lights with LEDs and replace ballast for 1 emergency light at 704-N.…
Complete Temp Mod 233H-TMC-18-261 to disconnect the exhaust fan and dampers from the interlock chain for Room 41 oxygen monitor.…
Install skirting around trailer and replace front entrance steps with aluminum type at 245-7F.…
Perform mercury analysis (EPA Method 7473) using a Milestone Direct Mercury Analyzer (DMA 80).…
Conduct 2D seismic survey along existing public roads in east central Illinois (Washington County).…
Clean Rural Shared Electric Mobility: The CRuSE Project…
Conduct 2D seismic survey along existing public roads in east central Illinois (McLean County and Ford County).…