Install four (4) monitoring wells and ten (10) soil borings in D-Area.…
The modification converts the Type IV waste tank high liquid level conductivity probe alarm circuits from Safety Significant to Safety Class.…
This EEC cover the Project design and Procurment of a new 13.8 kV Unit Substation to be situated near the existing 233-H Supply Fan Air Handling Un…
Out-of-service HVAC Equipment in 701-1K Room 15 will be removed and replaced with new HVAC equipment.…
The EEC covers the renovations for the interior of building 713-1N.…
D and R SRNL Storage Water Tank/Fire Pump Wireless Monitoring System.…
Replacement of the CAEX Fan No 3.…
Install flow meter, solar panel with grounding rod, sampler, and sensor in stream at FM-H1.…
Remodel 784-7A Locker Room No 5.…
Subcontractor will provide roof repairs at 702-A.…