Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
Install HPC Time Server Antenna and Cable in 707-C and 703-44A.…
Re-route 772-1F steam condensate discharge.…
This carbon contamination technique referred to as regeneration will be conducted per temporary modification 233H-TMC-15-181, associated WO 1389965…
Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area.…
The U. S. Department of Energy, U. S. Environmental Protection Agency, and South Carolina Department of Health and Environmental Control agreed tha…
Relocation of Drive-Thru Rapid COVID Testing Station from B-Area (735-4B) to N-Area (719-5N).…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system.…
Replace Carpet In Room 102, 772-F.…
This EEC covers the use of a Labconco benchtop lyophilizer and the lyophilization (freeze-drying) of nonhazardous aqueous samples.…