Rocky Mountain Region (RMR) is using a minor rate adjustment process to convert the existing rates for short-term sales for RMR to use under the We…
This Amended Determination follows ARPA-E's receipt of required information and certifications from additional Prime Recipients that were not cover…
The project team will (1) acquire and qualify magnesium-manganese oxide material
BPA proposes to fund the U.S. Geological Survey to implant Passive Integrated Transponder (PIT) tags in wild fall Chinook salmon (Oncorhynchus tsha…
BPA proposes to fund the Nez Perce Tribe (NPT) to perform ongoing habitat maintenance and restoration efforts in the Red River and Newsome Creek wa…
To advance a novel structured material system comprising a highly dispersed sorbent with a low-pressure drop support for direct air capture from p…
WUSTL will advance the integration of a Ti-Ce electrode-decoupled redox flow battery system with conventional fossil-fueled power plants through d…
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
The Mobile Melt Consolidation (MMC) Project components will be installed at 645-N.…