In this final rule DOE revises the current definition of “showerhead” adopted in a December 16, 2020 final rule by reinstating the prior definition…
In this final rule, DOE proposes to revise the Department’s test procedure interim waiver process.…
The objective of the project is to complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture system at cement…
Bonneville Power Administration (BPA) proposes to conduct activities listed below to operate and maintain high voltage electrical facilities throughout the BPA service territory.
The objective of this project is to construct and operate a Direct Air Capture (DAC) system combining Climeworks’ refined DAC process with Svante's…
This activity provides analytical support for R
Utilize a state-of-the-art X-ray diffractometer for characterization of a variety of materials for a wide range of NETL departments.…
This Amended Determination follows the approval of additional funds to support the project team's small-scale, research and development activities …
Funding will support the project team's information gathering and analysis efforts to transition the Hydro-FE-a simulation tool uniquely capable of…