Categorical Exclusion (CX) Determinations By Date

Bonneville Power Administration (BPA) proposes to allow T-Mobile to modify its existing unmanned telecommunications facility located adjacent to BPA’s Maple Valley Substation in Renton, King County, Washington (Township 23 North, Range 5 East, Section 20).
Bonneville Power Administration (BPA) proposes to replace an existing 230-kilovolt (kV) shunt capacitor group and associated switching and protective equipment at Longview Substation near Longview, Cowlitz County, Washington (Township 8 North, Range 3 East, Donation Land Claim 38).
Bonneville Power Administration (BPA) proposes to allow the ATT corporation to make upgrades to antennas and associated equipment within their existing communications facility located on structure 74/2 of the Monroe-Custer No. 1 240 kV transmission line.
The U.S. Department of Energy (DOE) is proposing to provide funding to the Ute Mountain Ute Tribe (UMUT) to install a ground-mounted photovoltaic (PV) system and approximately 20 roof-mounted PV systems in Towaoc, CO to offset the approximate annual electric demand on rental homes and a housing facility managed by the UMUT Housing Authority.
DOE LM is proposing to move approximately 17 full-time equivalent (FTE) Legacy Management Support (LMS) employees from the Delta Building at Harrison, Ohio to the Environmental Quality Management (EQM) building located in Cincinnati, Ohio.