This proposed activity will provide the mechanical replacement of the HVAC unit, A-723015-HVAC-ACU-001, located on the west side of building 723-15…
Remove approximately 10 feet of insulation on caustic line to identify and repair caustic leak.…
BPA proposes to replace structural components of the existing vehicle storage building at the Snohomish Substation with like materials and construction.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its North Gunnison-Skito (NGU-SKO) 115-kV Transmission Line.
The Bonneville Power Administration (BPA) proposes to allow the Pend Oreille Public Utility District (POPUD) to upgrade the existing secondary station service transformer at Sacheen Substation.
The U.S. Department of Energy (DOE) is proposing to issue a Funding Opportunity Announcement (FOA) (DE-FOA-0002588) for research and analysis awards focused on potential clean hydrogen deployments for specific geographic areas of the United States.
The 115 kV transformers, both switchgears A and B, associated 4160V secondary cables, protective relaying, breakers, and control wiring, 480V trans…
Remove insulation on caustic line to identify and repair caustic leak.…
This proposed activity is to remove two aging process air compressors located inside Section 18 of H Canyon and replace them with two new water-coo…
Relocate Mass Spectrometer system in Room 109 Building 264-H to Building 233-H Room 10.…