Repairs will include stabilizing the areas with soil-fill material where off-road vehicle use has occured, adding gravel to portions of the road th…
The project will determine whether the use of control systems and hybrid heating (gas and electric) technologies in multifamily (MF) and single-fam…
Replacement of 704-Z Fire Alarm Panel due to it being obsolete.…
A second lead melter (1,000 lb) will be installed and operated at the Complex.…
The proposed modification is to remove two abandoned Kanne Chambers that are Out-of-Service (OOS) in Lab C-061 per M-DCF-A-01422.…
Remove concrete and metal post to a minimum of 2 inches below grade prep area and apply asphalt to restore the area back to its normal configuratio…
In-well sensor will be installed in an existing groundwater piezometer well in the F-Area wetlands. Monitoring will be performed remotely.…
Install indoor PA speakers per attached work instructions in 703-A,784-3A, 784-1A, 703-46A, 703-45A, 723-A, 773-52A, 703-43A, 703-42A, 737-24A, 730…
Installation of electric vehicle charging stations across SRS.…
Develop Transmission Policy, Planning, and Project Development Guides for State Energy Offices.…