This project involves the replacement of Barricade 9 which will be performed by the US Army Corps of Engineers (USACE).…
Installation of a A Ductless Mini-Split HVAC system to provide supplemental cooling for building 730-A room 167.…
Install (Gardner Denver L22 30HP 460V Cooled 125PSI with AEON90000SP oil and moisture trap rotary screw compressor) in building 717-F Construction …
722-4A Remove asbestos insulation/mastic on the 2 roof drain pipes.…
The project will prepare a Phase I Environmental Site Assessment (ESA) in accordance with applicable EPA regulations and ASTM standards to evaluate…
The Bundle Storage (MTR) Rack is Safety Signifigant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exisi…
Bonneville Power Administration (BPA) proposes to replace a disconnect switch and several wood pole structures within the substation yard and recon…
Funding will support the project team's small-scale research and development of the cost-effective transfer of bulk electric power (up to 400 MW) a…