BMI and their partners will provide a Front-End Engineering Design (FEED) study for a Direct Air Capture (DAC) system at an existing (retrofit) dom…
702-A Install Keri door on entry No. 4.…
Construction is to paint the floors in the RRTAL cooldown room, electrical room, and protective clothing room as well as repair/paint the walls in …
Remove existing HVAC Unit No. 3 from building 717-5N and replace with a new 5-ton Carrier heat-pump package unit.…
Construction to excavate soil on west and north sides of 735-A, A-Wing Basement in order to repair existing underground commodity penetrations in t…
This project seeks to develop a high performance catalyst with significantly improved activity.…
Modify TRU PAD 4 for additional equipment. System will need electrical power and design support.…
Remove and replace fire dampers FD-292-104 and FD-292-115 and their associated penetration seals in Building 292-S.…
Modify the 511-S Steam System to an Out of Commission Configuration.…