Bonneville Power Administration (BPA) proposes to allow Henkels and McCoy, the applicant, to install about 610 feet of new underground fiber optic cable and buried cable marking tape in the rights-of-way for three BPA transmission lines: Ross - Vancouver Shipyard No. 1, North Bonneville - Ross No. 1, and North Bonneville - Ross No. 2.
Engineering Standard 15888 requires the change of HEPA/pre-filters. Maintenance will perform the seven year PM to change HEPA and prefilters.…
There is a sodium nitrite "jelly-like" blockage in the heel of the Sodium Nitrite Feed Tank located on the third level of 221-S. The blockage is pr…
709-1G Install power drop.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…
Caustic dissolution of alum-inum metal is to be studied to support fuel target processing.…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Hawai’i (UH), Hawai’i Natural Energy Institute (HNEI) to d…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Opus One Solutions (Opus USA) to design, develop, and demonstrate an…
The U.S. Department of Energy (DOE) is proposing to provide funding to Case Western Reserve University (CWRU) for the development and testing of an…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Connecticut (UC) (Storrs, CT) for the design, development …