This EEC covers all replacement Process Chiller Refrigerant Monitors that can be performed at Defense Waste Processing Facility (DWPF).…
722-A : Replace damaged floor tiles.…
PA system upgrades in C-Area buildings.…
Revision 4 will disable the fuse compressor HC1 and HC2 blown advisory alarms to eliminate the local alarm on the OP37 control panel.…
BPA proposes to correct 25 impairments on the Big Eddy- Redmond 230-kV No. 1 line. The impairments encroach on the maximum allowed distance (MAD) b…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
OGM to replace multiple valves in GB-500.…
Tritium Extraction Facility (TEF) Open Glovebox Maintenance on GB 3000 to rebuild GB recirculation blowers.…
Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 719-H Carport.…
704-1N Repair/Replace emergency lighting.…