Evaluate and repair a sinkhole in the area north of 218-1H and east of the 234-H main side Air Handling Unit.…
Replace Glovebox Glass Panel T-131-331-N-30 onto the Primary Stripper No.1 (P1) Glovebox via modified open glovebox maintenance (OGM).…
This project will provide temporary modular office space which shall include site preparation, general facility infrastructure, HVAC, electrical, d…
Utah - evaluation of slurry characteristics and operation of entrained-flow gasifier
Install exterior speakers in C-Area.…
DCF and associated work order to repair the bottom of P68 manhole and raise it to grade for easier access in the future.…
Facility will operate a single 5-cm x 5-cm square planar SOFC as a research platform.…
WAPA proposes emergency replacement of spacers on selected spans of its CPJ-ODA transmission line.…
The U.S. Department of Energy (DOE) is proposing to provide funding to Northwestern University (NU) to discern if mischmetal, a novel aluminum-ceri…
Field testing-based evaluation of chemically enabled CO2-EOR in the Southern Michigan Basin – focus on Trenton/Black River play. Includes logging, …