Subcontractor will provide roof repairs at 705-C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-C.…
Replace EQ Pump 001 at 607-16K.…
A 9975 package is being heated to a temperature of up to 250F with external and internal heaters.…
The study will involve the determination of the radiation stability of monosodium titanate (MST) in (1) simple simulant salt solution, (2) C0-60 ra…
This Second Amended Determination adds 3 projects (Purdue University, Biomason, Inc., and National Renewable Energy Laboratory) to the Determinatio…
Tank Farm to Defense Waste Processing Facility Interarea Waste Transfer Line Cathodic Protection System is to be removed.…
Controls for the Pour and Drain Turntable are to be migrated to the Delta-V Distributed Control System.…
Subcontractor will provide roof replacement at 702-T.…
Bonneville Power Administration (BPA) proposes to transfer ownership of several hatchery facilities within the exterior boundaries of the reservati…