Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returnig samples to glass vials, where the vials will be subsampled using…
Inert glovebox operations in 786-A to support R and D in which air sensitive material will be handled. This EEC captures only the operations around…
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
This demonstration project proposes to drill two horizontal enhanced methane capture pilot wells along the Fruitland Formation Coal Outcrop. …
The existing gel cell batteries used for the Tritium Extraction Facility (TEF) diesel generator are no longer available from the supplier. The curr…
The activity is to replace the 151-1K DC breaker panel due to age and normal wear over time.…
This revision adds in mycelium fermentation. This work consists of two similar tasks brewery wastewater and cheese whey digestion in a bioreactor, …
A lithium hydroxide electrodialysis pilot plant would be placed inside of the existing spill berm in the 369 HIBAY or in 370 W158 in a purchased an…
Assess the R and D capability of the university to develop a research scale modular high-pressure Municipal Solid Waste (MSW) gasifier for H2 produ…
Improve the temperature performance by at least 150 degrees Celsius of ceramic matrix composite (CMC) materials in high-hydrogen environments using…