Subcontractor will provide roof repairs at 225-22H. The Subcontractor will disturb the existing roof while performing these repairs on 225-22H.…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…
The Process Technology Programs (PTP) will conduct laboratory scale simulations of the Defense Waste Processing Facility (DWPF) process at the Aike…
SRNL will perform synthesis for the development of materials pertaining to photovoltaic devices such as electrolytes, (photo)sensitizers/anodes, an…
Bonneville Power Administration (Bonneville), along with the U.S. Army Corps of Engineers and the U.S. Bureau of Reclamation, proposes a second Ame…
In this final rule, DOE establishes new energy conservation standards for Dehumidifying Direct-Expansion Dedicated Outdoor Air Systems.
The Proposed Activity is to remove both of the stack pipes for 782-5M and 782-6M soil vapor extraction units for both safety and cost savings.…
Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F, to Building 711-1N or to availa…
The existing bubbless system to measure tank liquid levels are causing numerous unscheduled maintenance outages. The proposed solution is to replac…
A Network Operating Agreement between the City of New Madrid (Customer), Southwest Power Pool (Provider) and Southwestern Power Administration (Hos…