This is an "After-the-fact" EEC for stream monitors that were installed in 2020. Monitor stream discharge to investigate whether appropriate size b…
Initial investigation indicates that the compression fitting on the downstream side of HOOD-055 V-008 is leaking and requires repair and PROP-V-021…
Subtask 4.2a is permitting and site access related to seismic survey area. Subtask 4.2b is the hazard survey. Subtask 4.3 is laboratory analysis, a…
A FEED study for a DAC facility
The U.S. Department of Energy (DOE) is proposing to provide funding to Binghamton University (BU) to design, fabricate, and test components of a wa…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Guardian Devices, LLC for the design, development, assembly, and tes…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Utah for optimizing the composition, processing parameters…
The Casting Laboratory Glovebox located in MFC-752 is obsolete and no longer meets INL mission needs. Therefore, this glovebox will be removed to r…
The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) will acquire a 30-foot-wide perpetual access route along the west…
This project is to add a 115kV ring bus or a 115kV breaker and half to the Eagle Butte Substation.…