Repair cracks, joints, and patchwork (spalling) on concrete intruder barrier at R-Area Seepage Basin.…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
This EEC will cover general renovation activities in 735-2A.…
Radiological Protection (RP) has identified a curb on second level where contamination is leaching out of the concrete creating an Airborne Radioac…
Revision 3: The tie in to the existing 3 in. potable water main has changed. The new tie in location will be near Bldg. 724-36E.…
Paint sealands behind 704-C.…
Decommission and removal of IPNS pre-accelerators and 50MeV LINAC. Includes removal of vacuum and cooling systems. Isolation and termination of bui…
This change package is to extend Tank 32 purge fan stack to an elevation of 35 feet.…
706-N Freeze damage repair.…