The U.S. Department of Energy (DOE) is proposing to provide federal funding to Virginia Polytechnic Institute and State University (VA Tech) for th…
Pre-feasibility and pre-FEED study for a Direct Air Capture (DAC) Hub focused on Kern and/or nearby counties in California.…
General chemical and nanomaterial research support for Material Science and Clean Energy projects will be performed in various labs at the Applied …
Scope: R and D project requires the use of a Stud Welder to assemble the support structure.…
The EEC covers the sealing and coating of the base of south east corner of building 711-9N.…
This EEC covers the renovation of the upstairs office area in 713-1N to add 3 new offices.…
Air Diffuser Replacements at 766-H.…
Remove Power to the 284-13H and 284-15H Sealand Containers.…
701-4G Remove/replace flooring.…
The proposed activity is to isolate the discharge pathway (Manhole P34) of industrial wastewater generated in F-Area Complex (FAC) from the 281-5F …