This work will include replacement of two existing rooftop packaged HVAC units, located on the 773-A D-Wing roof. The Design Authority Engineer (DA…
Hydrogen Recombination Catalyst Efficiency Testing by NTS Personnel.…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal. All activities are performed in a glove box. The Plutonium Metal…
To conduct mechanical tests on alloys that have been exposed to tritium gas. This is a revision for renewal with no changes to an already approved …
Lab building improvements in 772-25B…
Perform grading activities on the west side of building 704-3N.…
Activities to troubleshoot, repair and/or replace light fixtures in radiological and non-radiological areas of L-area.…
Protective Bollards Installation at 715-K Fuel Station…
Chilled water pump #1 is no longer working at 285-H. Pump #1 will be replaced with like for like pump to restore dependable operability.…
Upgrade men's and women's locker rooms in 704-K. Revision 2 is specific to the removal/replacement of existing flooring in Room 18. Both men's and …