Categorical Exclusion (CX) Determinations By Date

This proposal covers two broad topics. Topic A is Developing and Enhancing Workforce Training Programs for the Electric Power Sector. Topic B is Smar…
Engineering Research Office Building (EROB) 1E- Human System Simulation Laboratory Modifications CX(s) Applied: B1.31 Date: 08/25/2009 Location(s): Idaho Offices(s): Idaho Operations Office
Purgewater Storage and Treatment Facility Unit #1 ClosureCX(s) Applied: B6.1Date: 08/19/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Characterization of the Coal Pile Runoff Basin 788-3A, Ash Pile 788-A, Outfalls A-013 and A-024CX(s) Applied: B3.1Date: 08/18/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Construction of 241-TY Interim Surface BarrierDate: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Facility Upgrades at 222-S Laboratory ComplexCX(s) Applied: B1.3, B1.7, B1.15, B1.31Date: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Electrical Isolation of Buildings 742-4A and 742-5ACX(s) Applied: B1.27Date: 08/18/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
H-4 Seepage Basin Drainage ImprovementsCX(s) Applied: B6.1Date: 08/11/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5CX(s) Applied: B3.1Date: 08/11/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office