E-Area Box Remediation ProjectCX(s) Applied: B6.6Date: 09/01/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Construct Rail Spur to Concrete Batch Plant, P-AreaCX(s) Applied: B1.13Date: 08/31/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Electrical Isolations of Various Trailers and Handi-House, A-AreaCX(s) Applied: B1.27Date: 08/31/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
This proposal covers two broad topics. Topic A is Developing and Enhancing Workforce Training Programs for the Electric Power Sector. Topic B is Smar…
Engineering Research Office Building (EROB) 1E- Human System Simulation Laboratory Modifications CX(s) Applied: B1.31 Date: 08/25/2009 Location(s): Idaho Offices(s): Idaho Operations Office
Purgewater Storage and Treatment Facility Unit #1 ClosureCX(s) Applied: B6.1Date: 08/19/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Characterization of the Coal Pile Runoff Basin 788-3A, Ash Pile 788-A, Outfalls A-013 and A-024CX(s) Applied: B3.1Date: 08/18/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Electrical Isolation of 713-4ACX(s) Applied: B1.27Date: 08/18/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Construction of 241-TY Interim Surface BarrierDate: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office
Facility Upgrades at 222-S Laboratory ComplexCX(s) Applied: B1.3, B1.7, B1.15, B1.31Date: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office