The work involves the installation of approximately 5,400 LF of conduits encased in concrete, 9 manholes, 9 padmount transformers and 2 pad mounted…
Clean and repaint the service bridge at 686-G, Steel Creek Dam.…
This activity is to provide high sensitivity analyses of samples from on and off site locations. These analyses are in support of site characteriza…
Pilot-scale deployment of olivine onto agricultural fields in central Mississippi for CO2 removal from the atmosphere through an Enhanced Rock Weat…
IID will advance and deploy an Advanced Distribution Management System (ADMS) system, which will integrate multiple elements of IID's existing oper…
Door stoppers on metal doors require repair or replacement…
Subcontractor will repair 707-C. The Subcontractor "will not" disturb the existing roof while performing these repairs on 707-C.…
This Temp Mod will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P43 near 607-20H. See NNSA-H-2024-00017, R0 for in…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Chiller systems used to regulate the temperature of R and D instrumentation/devices require a coolant for proper operation. Multiple chillers withi…