Subcontractor shall provide all personnel, equipment, materials, tools, and transportation required to perform wireline services for the SPR sites …
      This EEC covers the upgrades required to ensure the N-area "Paint Barn" 725-2N meets or exceeds NFPA Class 1 Division 2 requirements within the int…
      731-4N Correct toilet in women's restroom.…
      Install new shelf guard rails in building 713-N.…
      Relocate and Demolish N-Area Trailers.…
      Receiving Basin Off-Site Fuel (RBOF) Cask Pad Containment Activities…
      Fan 929 Subsystem Improvements, K-Area: Changes to air flow, controls and the heating system.…
      Parking Lot 613-1K and Quonset Building 663-K Paving…
      A new gate valve will be mounted downstream of the existing V-019 valve. The new valve will have supports mounted under it to reduce the cantilever…
      A Radar Indicating Level Transmitter will be installed on the Salt Feed Tank.…