Bonneville Power Administration (BPA) proposes in-kind replacement of four wood pole structures and associated structural/electrical components (e.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry method in 773…
703-43A Room 30 Install electrical and UW (Universal Wiring) to cubicles.…
SRMC plans to set up a Clemco Wet Blast Injector system adjacent to the Z-Area construction fabrication area to support work throughout SRMC.…
Repairing holes in sheetrock and painting the offices…
The Environmental Monitoring Group collects samples throughout the year to analyze for radiological and non-radiological constituents. After they a…
Revision 0: The Savannah River Site will replace recovery well RWM-1 with a new recovery well, RWM-001-R, due to a decrease in the groundwater flow…
The objective of this project is to complete the front-end engineering design and pre-construction planning activities for a demonstration facility…
Installation of two automated overhead switches and an IntelliNode device to self-heal the network in case of a circuit-level power outage.…
Installation of 47 GOABs throughout the electric system and installation of a line monitoring system.…