Placer County Biomass Utilization Pilot ProjectCX(s) Applied: A9Date: 05/20/2011Location(s): Placer County, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Install a Pressure Regulator and Relief Valve on the Tank 26 Flush Water PipingCX(s) Applied: B1.3Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Enhanced Low Activity Waste Disposal Premix Silo Area ModificationsCX(s) Applied: B1.3Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
704-N Wireless AccessCX(s) Applied: B1.3Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Laboratory Dissociation Constant (Kd) Measurements of Non-contaminated Solids and Rad Spiked SolutionsCX(s) Applied: B3.6Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Clean Up of 735-A Lab A-147CX(s) Applied: B3.6Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Microbiological Sample Preparation and Analysis For Use With Hybrid Microwave OvenCX(s) Applied: B3.6Date: 05/19/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Curecanti Substation Containment Wall, Montrose County, ColoradoCX(s) Applied: B1.6Date: 05/19/2011Location(s): Montrose County, ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region
Reintroduction of Westslope Cutthroat Trout in the Pend Orielle BasinCX(s) Applied: B1.20Date: 05/19/2011Location(s): Pend Oreille County, WashingtonOffice(s): Bonneville Power Administration
Sacajawea Substation ? Ice Harbor Dam Fiber Project (Amended)CX(s) Applied: B4.7Date: 05/19/2011Location(s): Walla Walla County, WashingtonOffice(s): Bonneville Power Administration