Categorical Exclusion (CX) Determinations By Date

The Snake River Geothermal Drilling Project - Innovative Approaches to Geothermal ExplorationCX(s) Applied: B3.1, A9Date: 06/17/2010Location(s): Twin Falls, IdahoOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Defense Waste Processing Facility Water Separation from Decon Frit: Analysis of Spent Decon Frit SlurryCX(s) Applied: B3.6Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Titrimetric Analysis Using the Radiometer Analytical TIM870 Titration Manager with AutosamplerCX(s) Applied: B3.6Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Waste Analysis Characterization Methods in the Analytical Development Wet Chemistry LaboratoryCX(s) Applied: B3.6Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Cross-Flow Ultrafiltration Cleaning and FoulingCX(s) Applied: B3.6Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Installation of Turbidity Meter Discharge Check ValvesCX(s) Applied: B2.5Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Repair 70 Ton Cask Lid Support Superstructure, L AreaCX(s) Applied: B1.3Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Repair Storm Water Drainage Outside the T-Area CapCX(s) Applied: B1.3Date: 06/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office