Third Party Services for Strategic Petroleum Reserves WorkoversCX(s) Applied: B5.12Date: 11/24/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Central Ferry Area Radio Communications ProjectCX(s) Applied: B4.6Date: 11/01/2010Location(s): Franklin County, WashingtonOffice(s): Bonneville Power Administration
Cable and Conduit Addition Within the Fenced Area of the Buck Boulevard SubstationCX(s) Applied: B4.6Date: 11/23/2010Location(s): Riverside County, CaliforniaOffice(s): Western Area Power Administration-Desert Southwest Region
Buck Boulevard Substation (Conduit Addition)CX(s) Applied: B4.6Date: 11/23/2010Location(s): Riverside County, CaliforniaOffice(s): Bonneville Power Administration
Replace West Hackberry Radio TowerCX(s) Applied: B1.19Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
West Hackberry Site Building Upgrades, Phase IICX(s) Applied: B1.3Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Install Amonix Panels at National Solar Thermal Test FacilityCX(s) Applied: B5.1Date: 11/23/2010Location(s): New MexicoOffice(s): Sandia Site Office
Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install)CX(s) Applied: B1.7Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change MaterialCX(s) Applied: A9, A11, B3.6Date: 11/23/2010Location(s): Wooster, OhioOffice(s): Fossil Energy, National Energy Technology Laboratory
Buck Boulevard SubstationCX(s) Applied: B4.6Date: 11/23/2010Location(s): Ripley, CaliforniaOffice(s): Western Area Power Administration-Desert Southwest Region