West Hackberry Site Building Upgrades, Phase IICX(s) Applied: B1.3Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Install Amonix Panels at National Solar Thermal Test FacilityCX(s) Applied: B5.1Date: 11/23/2010Location(s): New MexicoOffice(s): Sandia Site Office
Upgrade Communication/Control Systems to BC Brine Disposal Well (Government Furnished Equipment and Install)CX(s) Applied: B1.7Date: 11/23/2010Location(s): LouisianaOffice(s): Strategic Petroleum Reserve Field Office
Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change MaterialCX(s) Applied: A9, A11, B3.6Date: 11/23/2010Location(s): Wooster, OhioOffice(s): Fossil Energy, National Energy Technology Laboratory
Buck Boulevard SubstationCX(s) Applied: B4.6Date: 11/23/2010Location(s): Ripley, CaliforniaOffice(s): Western Area Power Administration-Desert Southwest Region
Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change MaterialCX(s) Applied: A1, A9, A11Date: 11/23/2010Location(s): Wooster, OhioOffice(s): Fossil Energy, National Energy Technology Laboratory
Re-Utilization of Industrial Carbon Dioxide for Algae Production Using a Phase Change MaterialCX(s) Applied: A9, A11, B3.6Date: 11/23/2010Location(s): Dexter, MichiganOffice(s): Fossil Energy, National Energy Technology Laboratory
Kentucky-County-HardinCX(s) Applied: B3.6, B5.1Date: 11/23/2010Location(s): Hardin County, KentuckyOffice(s): Energy Efficiency and Renewable Energy
Alternative and Unconventional Energy Research and DevelopmentCX(s) Applied: A9, B3.1, B3.6Date: 11/23/2010Location(s): UtahOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Installation of Bryan Mound and West Hackberry Wellhead Survey MonumentsCX(s) Applied: B1.3Date: 11/23/2010Location(s): TexasOffice(s): Strategic Petroleum Reserve Field Office