Installation of Maximum Energy Efficiency Building Research Laboratory Geothermal System (3618X)CX(s) Applied: B5.1Date: 01/06/2011Location(s): Oak Ridge, TennesseeOffice(s): Environmental Management, Oak Ridge Office
Ostrander Substation AdditionCX(s) Applied: B4.11Date: 01/06/2011Location(s): Clackamas County, OregonOffice(s): Bonneville Power Administration
Asbestos Involved Work in K-Area Complex FacilitiesCX(s) Applied: B1.16Date: 01/05/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
A Permeable Active Amendment Concrete (PAAC) for Contaminant Remediation and Erosion ControlCX(s) Applied: B3.6Date: 01/05/2011Location(s): Aiken, South CarolinaOffice(s): Savannah River Operations Office
Provision of Funds to the Idaho Department of Fish and Game For Purchase of the Tall Pines PropertyCX(s) Applied: B1.25Date: 01/05/2011Location(s): Kootenai County, IdahoOffice(s): Bonneville Power Administration
Olallie, Yellow Lake, Sea Lea Hill Wireless Communication ProjectsCX(s) Applied: B1.7, B1.19Date: 01/05/2011Location(s): King County, WashingtonOffice(s): Bonneville Power Administration
Installing Fiber Optic Cables Between Bonneville Power Administration?s Ashe Substation and Energy Northwest?s Columbia Generating StationDate: 01/05/2011Location(s): Benton County, WashingtonOffice(s): Bonneville Power Administration
Radioactive Waste Management Complex ? Analytical Laboratory OperationsCX(s) Applied: B3.1Date: 01/05/2011Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office
Redland South and Oregon City Microwave Tower Wireless Communication ProjectsCX(s) Applied: B1.7, B1.19Date: 01/05/2011Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration
Copper Indium Gallium Sulfur-Selenide (CIGSS) Manufacturing PlantCX(s) Applied: B1.31Date: 01/05/2011Location(s): San Jose, CaliforniaOffice(s): Loan Guarantee Program Office