Coal Pile Basin Project CX(s) Applied: B1.29Date: 05/31/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Office of NEPA Policy and Compliance
May 31, 2012Coal Pile Basin Project
CX(s) Applied: B1.29
Date: 05/31/2012
Location(s): Tennessee
Offices(s): Y-12 Site Office
The proposed action is provide demolish and deactivate the coal pile basin to grade where practical and backfill below grade portion of basin; the remaining underground portion of the stock out conveyor structure, both entrances and backfill pit; and remove universal waste, conveyor belt, asbestos; and, miscellaneous shed type structure at the south entrance to the coal pile.