Interagency Study on the Implementation of Integrated Computational Materials Engineering… CX(s) Applied: A9, A11 Date: 09/07/2012 Location(s): Virginia Offices(s): National Energy Technology Laboratory
(0675-1570) Washington University in St. Louis - Optimal Operation and Management of Energy Storage Systems Based on Real-Time Predictive Modeling and Adaptive Battery Management Techniques CX(s) Applied: B3.6 Date: 09/07/2012 Location(s): Missouri, C...
Analytical Sample Preparation Laboratory CX(s) Applied: B3.6 Date: 09/07/2012 Location(s): Oregon Offices(s): National Energy Technology Laboratory
Reconstructing Paleo-SMT Positions on the Cascadia Margin Using Magnetic Susceptibility CX(s) Applied: A9, B3.6 Date: 09/07/2012 Location(s): New Hampshire Offices(s): National Energy Technology Laboratory
Development of High Operating Temperature Heat Transfer Fluids for Solar Thermal Power Generation CX(s) Applied: A9, B3.6 Date: 09/07/2012 Location(s): California Offices(s): Golden Field Office
Structural and Stratigraphic Controls on Methane Hydrate Occurrence and Distribution… CX(s) Applied: A9 Date: 09/07/2012 Location(s): Oklahoma Offices(s): National Energy Technology Laboratory
Hydrate-Bearing Clayey Sediments: Morphology, Physical Properties, Production and Engineering... CX(s) Applied: A1, A9, B3.6 Date: 09/07/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory
Mapping Permafrost and Gas Hydrate using Marine CSEM Methods CX(s) Applied: B3.6 Date: 09/07/2012 Location(s): California Offices(s): National Energy Technology Laboratory
Mapping Permafrost and Gas Hydrate using Marine CSEM Methods CX(s) Applied: B3.1 Date: 09/07/2012 Location(s): Alaska Offices(s): National Energy Technology Laboratory
Big 8 - 922, 920, 921 Heating, Ventilation and Air Conditioning Upgrades; 921, 74 Roof Replacement; HPSB Upgrades CX(s) Applied: B2.1, B2.2, B2.3 Date: 09/07/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory