Snohomish-Murray Relocation of Wood Pole at Structure 9/4CX(s) Applied: B4.6Date: 08/26/2011Location(s): Snohomish County, WashingtonOffice(s): Bonneville Power Administration
Water Treatment Plant Motors: Elkton Water Treatment PlanCX(s) Applied: B5.1Date: 08/26/2011Location(s): Elkton, MarylandOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Delaware State Energy Office Sub Grantee/Bridgeville Well Pump ReplacementCX(s) Applied: B5.1Date: 08/26/2011Location(s): Bridgeville, DelawareOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
Relocation of Trailers in 100-R and 100-P AreasCX(s) Applied: B1.22Date: 08/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside TrailCX(s) Applied: B4.9Date: 08/25/2011Location(s): Beaverton, OregonOffice(s): Bonneville Power Administration
Rhode Island-City-PawtucketCX(s) Applied: A9, A11, B1.32, B2.5, B5.1Date: 08/25/2011Location(s): Pawtucket, Rhode IslandOffice(s): Energy Efficiency and Renewable Energy
Florida-City-West Palm BeachCX(s) Applied: A1, A9, B1.32, B2.5, B5.1Date: 08/25/2011Location(s): West Palm Beach, FloridaOffice(s): Energy Efficiency and Renewable Energy
La Puente City Hall Heating, Ventilation, and Air Conditioning SystemDate: 08/25/2011Location(s): LaPuente, CaliforniaOffice(s): Energy Efficiency and Renewable Energy
Building 84 Laboratory RenovationCX(s) Applied: A11, B1.15, B3.6Date: 08/25/2011Location(s): Pittsburgh, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
GTherm Single Well Engineered Geothermal System for Depleted or Abandoned WellsCX(s) Applied: A9, B3.6Date: 08/25/2011Location(s): ConnecticutOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office