Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project  CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
      Oregon City-Chemawa #2 Wood Pole Replacement Projects  CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
      Dry Air Glovebox Projects CX(s) Applied: B1.31Date: 05/31/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
      University of Wisconsin Oshkosh Anaerobic Dry Digestion Facility  CX(s) Applied: A9, B3.6, B5.20 Date: 05/31/2012 Location(s): Wisconsin Offices(s): Golden Field Office
      Vegetative Response to Metal Exposure in a Growing Media   CX(s) Applied: B3.6 Date: 05/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
      Infrastructure Demolition, Replacement, and Related Activities at the Weldon Spring, Missouri, Site  CX(s) Applied: B1.3, B1.7, B1.15, B1.23, B1.24, B1.26, B1.36, B3.1, B4.7 Date: 05/31/2012 Location(s): Missouri Offices(s): Legacy Management
      Composite Riser for Ultra-Deepwater High Pressure Wells  CX(s) Applied: A9 Date: 05/31/2012 Location(s): Nebraska Offices(s): National Energy Technology Laboratory
      St. Petersburg Solar Pilot Project  CX(s) Applied: B5.16 Date: 05/31/2012 Location(s): Florida Offices(s): Golden Field Office
      Small Scale Electrical Power Generation from Heat Co-produced in Geothermal Fluids  CX(s) Applied: A9, B3.6, B5.2, B5.15 Date: 05/31/2012 Location(s): Nevada Offices(s): Golden Field Office
      Scale Resistant Heat Exchangers for Low Temperature Geothermal Binary Cycle Power Plant  CX(s) Applied: A9, B5.2, B5.15 Date: 05/31/2012 Location(s): California Offices(s): Golden Field Office
       
        