Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
UPF Mock Wall Project CX(s) Applied: B3.6 Date: 11/29/2011 Location(s): Tennessee Offices(s): Y-12 Site Office
Parts Washer Project CX(s) Applied: B1.23, B1.31 Date: 11/29/2011 Location(s): Tennessee Offices(s): Y-12 Site Office
United Technologies Research Center - Thermal Storage Using Hybrid Vapor Compression Adsorption System CX(s) Applied: A9, B3.6 Date: 11/29/2011 Location(s): Connecticut, Michigan Offices(s): Advanced Research Projects Agency-Energy
Record of Categorical Exclusion for Tear Down, Inspect and Repair Bayou Choctaw Brine Filters at BDW Pad 1 CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office
University of South Florida - Development of a Low Cost Thermal Energy Storage System Using Phase Change Materials with Enhanced Radiation Heat Transfer CX(s) Applied: A9, B3.6, B3.15 Date: 11/29/2011 Location(s): Florida Offices(s): Advanced Research...
Energy Retrofits CX(s) Applied: B5.1 Date: 11/29/2011 Location(s): Colorado Offices(s): Energy Efficiency and Renewable Energy
Administration and Professional Support Services for the SBIR and STTR Programs CX(s) Applied: A1, A2 Date: 11/29/2011 Location(s): Illinois Offices(s): Chicago Office
"Development and Demonstration of Self-Expanding Well Construction Technology, Effecting Step Change
Reductions in Geothermal Well Cost and Increased Productivity CX(s) Applied: A9, B3.6 Date: 11/29/2011 Location(s): Colorado Offices(s): Golden Field...
Reductions in Geothermal Well Cost and Increased Productivity CX(s) Applied: A9, B3.6 Date: 11/29/2011 Location(s): Colorado Offices(s): Golden Field...
Energy Retrofits CX(s) Applied: B5.1 Date: 11/29/2011 Location(s): California Offices(s): Energy Efficiency and Renewable Energy