Integration of the University of Oregon’s Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Transition the Umatilla Coho Production Program to a Local Broodstock Program CX(s) Applied: B1.20 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Grant New Cingular Wireless’ request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Sanford Underground Research Facility CX(s) Applied: B2.1; B3.6 Date: 12/01/2011 Location(s): South Dakota Offices(s): Berkeley Site Office
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Rhode Island Offices(s): Energy Efficiency and Renewable Energy
Energy Retrofits CX(s) Applied: B5.1 Date: 12/01/2011 Location(s): Kentucky Offices(s): Energy Efficiency and Renewable Energy
DeSoto Photovoltaic Variability Study CX(s) Applied: B3.1, A9, B1.11 Date: 12/01/2011 Location(s): Florida Offices(s): Golden Field Office
Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-rock Interactions and Magnetotelluric Surveys CX(s) Applied: A9, B3.6 Date: 12/01/2011 Location(s): Utah Offices(s): Golden Field Office