Associated Electric Cooperative, Inc. Substation Improvements CX(s) Applied: B4.6 Date: 12/05/2011 Location(s): Missouri Offices(s): Southwestern Power Administration
Record of Categorical Exclusion for Repair Erosion Problems at Big Hill Raw Water Intake Structure CX(s) Applied: B1.3 Date: 12/05/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Hot Carrier Collection in Thin Film Silicon with Tailored Nanocrystalline/Amorphous Structure CX(s) Applied: B3.15, A9, B3.6 Date: 12/05/2011 Location(s): Colorado Offices(s): Golden Field Office
Carbon Absorber Retrofit Equipment (CARE) CX(s) Applied: B3.6 Date: 12/05/2011 Location(s): Colorado Offices(s): National Energy Technology Laboratory
ATK - A High Efficiency Inertial Carbon Dioxide Extraction System CX(s) Applied: A9, B3.6 Date: 07/01/2011 Location(s): New York, Pennsylvania Offices(s): Advanced Research Projects Agency-Energy
Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration
Donald Danforth Plant Science Center - Center for Enhanced Camelina Oil CX(s) Applied: B3.6, B3.8 Date: 12/02/2011 Location(s): Michigan, Missouri, Montana, Nebraska, New Mexico Offices(s): Advanced Research Projects Agency-Energy
Provision of Funds To The Idaho Department of Fish and Game (IDFG) To Purchase the Rapid Lightening Creek Conservation Easement CX(s) Applied: B1.25 Date: 12/01/2011 Location(s): Idaho Offices(s): Bonneville Power Administration
McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration